We inspire the World with new technologies

First underground structure built entirely by robots
24 October 2022

hyperTunnel’s ‘Peak XV’ tunnel demonstrates the potential of a radical new construction method to transform urban planning – by building underground infrastructure faster, more affordably and more sustainably than current techniques.

 

hyperTunnel has revealed the world’s first entirely robot-constructed underground structure, built at its R&D facility in the North Hampshire Downs.

 

hyperTunnel’s completely new automated construction method is designed to build tunnels more than 10 times faster and at half the cost of conventional methods. The approach is significantly friendlier to the environment and will use sustainable materials such as low-carbon concrete. Without any human needing to enter the structure during construction, the hyperTunnel method could transform safety in the tunnelling industry.

 

 

More: hypertunnel.co.uk

Next: Tesla expected to show humanoid robot Optimus

Explore our assets

  +85

We currently
employ

 +400

Large
projects

 +20

Years
of Experience
© 2023  |  TRASKO Automatyka sp. z o. o.
Project and realization MYKK
plen